Learn About Our Facility Challenges

Our Needs Create Obstacles

We are proud to provide small class sizes, fine arts activities and clubs, athletic programs, vocational academies and elementary STEM programming, and college courses to best position our students for the future, whatever path they choose.

Our buildings require important improvements to continue serving our students and staff well.

We’ve maintained our facilities well over the years, but limited state dollars and aging buildings continue to put pressure on how we are able to do that.

two main challenges

1

Both of our schools have aging building components and infrastructure that need improvements or replacements. Several components of our buildings’ exteriors are failing or deteriorating and need to be fixed or replaced. These components keep weather out, manage moisture, and protect what’s behind them.

2

Our junior/senior high school has safety and security, accessibility, and educational-space limitations that affect daily operations and how our students learn.

FAIRMONT ELEMENTARY SCHOOL

Our elementary school was originally built in 1954, with additions completed in 1970, 2000, and 2011. Identified needs include: 

  • Exterior doors at the north end of our 1954 building have exceeded their expected life and need to be replaced. 

  • Seals around the skylights and caulk around windows, sills, and metal panels are deteriorating and need to be replaced. 

  • Mortar joints have failed and bricks are damaged in many areas around the 1954 and 1970 portions of our building and must be fixed. 

  • Exterior finish areas are cracked or damaged, and caulk is beginning to fail. 

  • Exterior metal panels around areas of our building are deteriorated and need to be replaced. 

  • The original elevator has exceeded its expected service life, and finding replacement parts is increasingly difficult. 

  • Flooring in our 1954 classrooms, support spaces, and corridors are worn past their expected life. Most of the vinyl composite tile flooring was installed over the original asbestos-containing tile flooring, which makes repairs difficult and expensive.

FAIRMONT JUNIOR/SENIOR HIGH SCHOOL

Our junior/senior high school was originally built in 1970, with additions completed in 2010 and 2022. Identified needs include: 

  • Wastewater piping beneath first-floor corridors in two areas of our building is failing, including the first floor corridor of the vocational wing and the west side of the performing arts center. We can’t wait to address this failing pipe any longer, and it must be replaced. 

  • Our current main entrance configuration does not allow office staff to vet visitors face-to-face before visitors gain access to the building. Our entrance needs to be improved to ensure the safety of our students and staff.  

  • Exterior caulking, sealants, door frames, and selected masonry and interior finishes require repair or replacement.

  • Our current band, choir, orchestra, and theater classrooms don’t have enough space and are confined to our basement. Band and orchestra groups cannot consistently practice together in their existing rooms and must move to the performing arts center. Existing music classrooms are located in our basement, there are no restrooms in that area, and students must use stairs to move large instruments and equipment between the basement and performance spaces. We need to provide adequate space to support these growing programs. 

  • Flooring in corridors near our vocational wing, performing arts center, and gymnasiums is worn and needs replacement.

  • Synthetic athletic flooring in both auxiliary gymnasiums is past its useful life and needs to be replaced.

  • The lockers, finishes, and fixtures in our locker rooms are worn and not ADA-compliant. Communal showers are the only option, impacting student privacy. 

  • Our 2022 CTE addition is not connected to the main building by a breezeway, exposing students to inclement weather and creating a building-security concern.