Two Questions Plan to Meet Our Needs
On Tuesday, February 9, residents will vote on two separate ballot questions. Question 1 focuses on critical infrastructure improvements, including health, safety and security, accessibility, and overall building integrity. Question 2 focuses on educational support, including a classroom addition to support choir, orchestra, and theater. Question 2 can only pass if Question 1 also passes.
Two separate questions to address our facility and educational needs.
QUESTION 1
$9.75 million for health, safety, security, accessibility and critical facility improvements, including exterior building corrections, replacing failing wastewater piping, a secure entrance, and more.
QUESTION 2
$11.64 million for educational support and other facility improvements, including flooring updates and additional classroom space for band, choir, orchestra and theater programs. Question 2 can pass only if Question 1 also passes.
QUESTION ONE
Health, Safety, Accessibility, and Critical Facility Improvements ($9.75 million)
Question 1 focuses on the critical infrastructure improvements, including health, safety and security, accessibility, and overall building integrity.
-
Replace three exterior doors serving the north end of our 1954 building.
Replace skylight seals and caulk around existing windows, windowsills, and roof-level exterior metal panels.
Replace deteriorated exterior metal panels at the 1970 gymnasium and 2011 entrance.
Tuckpoint mortar joints, replace damaged bricks, repair exterior finish areas, and replace failed control-joint caulk.
Modernize our original elevator with a new power unit, controller, cab, hoistway equipment, fixtures, stations, doors, and related work needed for a code-compliant two-stop passenger elevator.
-
Replace the failing wastewater piping beneath first-floor corridors in the vocational wing and west of the performing arts center.
Construct a new secure entrance and office addition to improve visitor check-in and building access control. Our existing office area would be remodeled for program and support uses.
Replace or repair selected exterior caulking, sealants, doors, frames, masonry, and interior finishes to improve overall building infrastructure and integrity.
Update and remodel our existing locker rooms with new lockers, finishes, plumbing fixtures, and single-stall showers to improve accessibility, longevity, and privacy.
Construct an enclosed breezeway connecting the 2022 CTE addition to the vocational wing to improve accessibility, especially during bad weather.
QUESTION two
Education Support and Other Facility Improvements ($11.64 Million)
Question 2 focuses on educational support, including a classroom addition to support choir, orchestra, and theater. Question 2 can only pass if Question 1 also passes.
-
Install new vinyl tile in selected classrooms, support spaces, and first and second floor corridors in the 1954 portion of our building.
Repair, cut, polish, and seal all terrazzo flooring in the 1954 portion of our building.
-
Build an addition to provide larger and improved classrooms, restrooms, and support spaces for our growing band, choir, orchestra, and theater programs. The addition would be built on the east side of our existing performing arts center. Our basement, the space where these programs currently occupy, would be repurposed for general storage space and additional program support space.
Replace synthetic athletic flooring in both auxiliary gymnasiums.
Repair and replace the flooring in the corridor from the performing arts center to both gymnasiums and the first and second floor corridors of the vocational wing.
junior/senior high school improvements
Secure Entrance Rendering
This rendering is conceptual and not finalized. If approved, the design process would involve stakeholder input to ensure the design is inclusive.
elementary school improvements | First floor
elementary school improvements | second floor
The floor plans above are conceptual and not finalized. If approved, the design process would involve stakeholder input to ensure the design is inclusive.
How the proposed plan impacts our students, staff, and communities
If residents approve the referendum, the benefits include renewed facilities, safer and more secure buildings, and educational spaces designed to address our needs.
Renewed facilities
The referendum would renew aging exterior components, infrastructure, elevators, flooring, locker rooms, and other spaces to extend the useful life of our buildings and reduce pressure on our long-term maintenance plan.
Safer and more secure buildings
The referendum would improve safety and security at our junior/senior high school by controlling visitor check-in and access.
Educational spaces designed to address our needs
The referendum would provide appropriate learning environments for our band, choir, orchestra, and theater programs. The breezeway would also provide an enclosed connection to our CTE space.
Ultimately, residents will decide whether to make these improvements.